Project Description

Project Details

Gulf Consolidated Contractors Co. (GCC)

Electrical, Instrumentation & FO Installation, Testing & Commissioning.

  • Civil, Electrical & Instrumentation Works in Substations and Remote Sites.
  • FOC from SATORP to KFI port 33,800 meters on Steel Structure.
  • FOC & Power Cable from SATORP to Berry Gas Plant 30,000 meters through trenches & Duct banks.

Following activities were performed :

  • 13.8 KV SS / Control Building / Scrappers / Skids and Remote Location Electrical & Instrumentation Scope

  • FO 12, 48 & 96 Fiber Installation for HFO 20 inch, Paraxylene 6 inch, Benzene 8 inch. Lines through Cable Tray from SATORP Plant to Port 33,800 Mtrs x 3

  • FO 12 & 48 Installation for LPG & Sulphur Lines Berry Gas Plant through Excavation 33,800 Mtrs x 2

  • 13.8 KV SS Construction E & I works

  • Control Building E & I Works

Project Details

Gulf Consolidated Contractors Co. (GCC)

HTS Cable Installation.

  • Heat Tracing Cable HTS Installation
  • Heat Tracing Cable HTS Installation for HFO 20 inch, Paraxylene 6 inch, Benzene 8 inch Lines through Cable Tray from SATORP Plant to Port 33,800 Mtrs x 10.
  •  Heat Tracing Cable Installation for Sulphur 6 inch line from SATORP to Sulphur Scrapper Berry Gas Plant.