Project Description

Project Details
Gulf Consolidated Contractors Co. (GCC)
Electrical, Instrumentation & FO Installation, Testing & Commissioning.
- Civil, Electrical & Instrumentation Works in Substations and Remote Sites.
- FOC from SATORP to KFI port 33,800 meters on Steel Structure.
- FOC & Power Cable from SATORP to Berry Gas Plant 30,000 meters through trenches & Duct banks.

Following activities were performed :
13.8 KV SS / Control Building / Scrappers / Skids and Remote Location Electrical & Instrumentation Scope
FO 12, 48 & 96 Fiber Installation for HFO 20 inch, Paraxylene 6 inch, Benzene 8 inch. Lines through Cable Tray from SATORP Plant to Port 33,800 Mtrs x 3
FO 12 & 48 Installation for LPG & Sulphur Lines Berry Gas Plant through Excavation 33,800 Mtrs x 2
13.8 KV SS Construction E & I works
- Control Building E & I Works
Project Details
Gulf Consolidated Contractors Co. (GCC)
HTS Cable Installation.
- Heat Tracing Cable HTS Installation
- Heat Tracing Cable HTS Installation for HFO 20 inch, Paraxylene 6 inch, Benzene 8 inch Lines through Cable Tray from SATORP Plant to Port 33,800 Mtrs x 10.
- Heat Tracing Cable Installation for Sulphur 6 inch line from SATORP to Sulphur Scrapper Berry Gas Plant.