Project Description

Project Details

115KV S/S @ Khurais

Installationworks at Sub-Station

  • Installation of 25MVA Transformers 115 / 34.5kV, Including oil filtration and filling of oil
  • Installation of 29 Bay MV Switchgear
  • Installation of Bus Duct between Transformer and MV Switchgear
  • Installation of Indoor / Outdoor lighting with Poles
  • Installation of LV / MV Switchgears with Terminations & Splicing
  • Installation of UPS / Battery Chargers and Other Protection Panels

Following activities were performed :

  • 13.8 KV SS / Control Building / Scrappers / Skids and Remote Location Electrical & Instrumentation Scope

  • FO 12, 48 & 96 Fiber Installation for HFO 20 inch, Paraxylene 6 inch, Benzene 8 inch. Lines through Cable Tray from SATORP Plant to Port 33,800 Mtrs x 3

  • FO 12 & 48 Installation for LPG & Sulphur Lines Berry Gas Plant through Excavation 33,800 Mtrs x 2

  • 13.8 KV SS Construction E & I works

  • Control Building E & I Works