Project Description

Project Details

Utilities & Industrial Power Services

Shutdown Project

Callibration of field instruments
  • Removal & re-installation of level transmitters
  • Disconnect & re-connect all electrical & instrument connection and amphynol plug.
  • Removal of cable tray, brackets & accessories.
  • Re-installation of cable tray, brackets & accessories.
  • Cleaning of transmitters.
  • Wet Calibration of transmitters.
  • Dismantling of valves.
  • Cleaning of valves.
  • Re-installation of valves & its accessories

Project Details

GE-Bently / ATCO

VMS & TMS Upgrade

Upgradation of GE-Bently Nevada System
  • Dismantling of the existing Bently Nevada 3300 / 7200 panels.
  • Installation of Bently Nevada LCD displays.
  • Laying of the signal cables from the marshalling TB’s to the 3500 System.
  • Supply & installation of redundant power cable for the new VMS cabinet.
  • Supply & installation of CAT6 communication cable for the System-1.
  • Meggering of the power cable and Installation of Ethernet Switches.
  • Loop checks
  • SAT assistance
  • Upgradation of ILD’s.
  • As-Built