Project Description

Project Details
Utilities & Industrial Power Services
Shutdown Project
Callibration of field instruments
- Removal & re-installation of level transmitters
- Disconnect & re-connect all electrical & instrument connection and amphynol plug.
- Removal of cable tray, brackets & accessories.
- Re-installation of cable tray, brackets & accessories.
- Cleaning of transmitters.
- Wet Calibration of transmitters.
- Dismantling of valves.
- Cleaning of valves.
- Re-installation of valves & its accessories
Project Details
GE-Bently / ATCO
VMS & TMS Upgrade
Upgradation of GE-Bently Nevada System
- Dismantling of the existing Bently Nevada 3300 / 7200 panels.
- Installation of Bently Nevada LCD displays.
- Laying of the signal cables from the marshalling TB’s to the 3500 System.
- Supply & installation of redundant power cable for the new VMS cabinet.
- Supply & installation of CAT6 communication cable for the System-1.
- Meggering of the power cable and Installation of Ethernet Switches.
- Loop checks
- SAT assistance
- Upgradation of ILD’s.
- As-Built