Project Description

Project Details
Olayan Descon
Prill Tower Emission Control Exit Air Cleaning Unit and Crystallization Unit.
Civil & Steel Structural Works
Engineering, Design, Supply, Installation, Testing & Commissioning.
- MCC 303-k building (Foundation 123.50 m3, Walls 813.00 m2, roof of Transformers 115.00 m2, roof over building 316.00 m2).
- Fertilizer storage / UAS crystallisation building (Foundation Levelling concrete 160 m3, T.R.C 30 m3 Total steel 150000 kg)
- Steel Structure Works – 1000 Tons
- Pipe Racks
- Prill Tower Support Structure
- Scrubber Support Structure