Project Description

Project Details

Olayan Descon

Prill Tower Emission Control Exit Air Cleaning Unit and Crystallization Unit.
Civil & Steel Structural Works
Engineering, Design, Supply, Installation, Testing & Commissioning.

  • MCC 303-k building (Foundation 123.50 m3, Walls 813.00 m2, roof of Transformers 115.00 m2, roof over building 316.00 m2).
  • Fertilizer storage / UAS crystallisation building (Foundation Levelling concrete 160 m3, T.R.C 30 m3 Total steel 150000 kg)
  • Steel Structure Works – 1000 Tons
  • Pipe Racks
  • Prill Tower Support Structure
  • Scrubber Support Structure